Specifications

CAK50/CAK61 SERIES ERROR! USE THE HOME TAB TO APPLY 标题 1 TO THE TEX
SHENYANG MACHINE TOOL CO., LTD 15
Read the installing procedure carefully, and install the machine according to the
requirements specified, so that the machine can perform high-precision machining.
3.4.1 Foundation
For installing the machine, a plane installation place should be first found, then arrange
the environment according to the specifications and determine the installation space
according to the foundation plan.
The floor space of machine includes the machine itself and maintenance space, which
has been specified in Foundation Plan.
3.4.2 Temporary Leveling
Lift up the machine and set the foundation bolts and wedges into the boltholes for
leveling.
Put down the machine slowly to make the foundation bolts come into the
foundation holes according to the stipulations given by the Foundation plan.
Insert the wedges into the bottom of the bed for temporary leveling to obtain rough
adjustment.
Fix the foundation bolts with cement after rough adjustment.
If the anti-vibration wedges are used, they can be directly put on the plane cement
made floor.
3.5 Inspection of Inner Devices Connection
After the leveling, before switching on the machine, the following preparation work
should be done
Be sure that grounding wire connected correctly (resistor is lower than 10).
Tighten the screws on terminals.
Re-check whether couplings are connected tightly.
Make sure the printed-circuit boards inside NC devices are not moveable.
Make sure that input power supply is in correct phase, and otherwise NC device or
AC converting control board may have troubles.
3.6 Inspection before Operation
After connection of inside devices, check the mechanical system and electrical system of
the machine according to the following rules.
Cleaning
Sliding surfaces and metal parts surfaces of the machine were covered with a film
of antirust for rust proof. Some dust, sand or other dirty things may come into the