Specifications

SASE Company, Inc. Sales—Rentals—Service—Leasing Toll Free Nationwide 800.522.2606
SECTION VI:
MAINTENANCE SCHEDULES
Daily Maintenance:
Check hydraulic oil level
Torque wheel lug bolts to 125 ft/lbs
Inspect all hydraulic components and hoses for leaks and correct leaks immediately
50 Hour Maintenance:
“Top off” hydraulic oil tank
Torque wheel hub nuts to 325 ft/lbs
Grease blade arm pivots at base of blade arms (near tires)
Grease front caster wheel and inspect for damage to tread
Check and tighten all hydraulic fittings
Inspect hydraulic hoses for damage
Inspect and tighten all joystick steering linkages
100 Hour Maintenance: (in addition to 50 hr maintenance requirements)
Drain and replace hydraulic oil and filter
Be Aware of the Effects of Harsh Environments to the Scraper Equipment:
The constant and continuous impacts of ceramic tile removal could cause premature
loosening of bolts and nuts over entire machine
Use of non-marking (white) tires on ceramic tile, marble, or sharp edged debris will result in
extreme tire damage. Black tires are recommended
Carpet removal will generally result in front transport caster being wrapped with stray carpet
strings. Remove debris from wheel daily to prevent irreparable damage to wheel tread