Owner`s manual
8. Install the Right handrail.
A. Position the right handrail in the correct position on the right side where the left handrail was
removed in step 6C.
B. Apply Threadlocker (#11) to threads inside the arm and screws removed in step 6D.
C. Secure the right handrail with the two screws and washers removed in step 6D. NOTE: When
tightened properly, frame tabs are pulled tight to the bearing.
D. Locate right linkage rod, right handrail, linkage rod cap (#17), flange spacer (#12), screw
.250-20 x .75 (#15) and washer .281 x .50 (#20). See Figure 8.
E. Secure linkage rod to handrail with linkage rod cap (#17), flange spacer (#12), BHSCS
.250-20 x .75 (#15) and washer .281 x .50 (#20) as shown in Figure 8 and 9. NOTE: The
screw (#15) m ust be tightened to a minimum of 90 inch-pounds.
Cybex Arc Trainer 630A Owner’s Manual
Figure 10
Left Handrail
Right Handrail
Correct Position
Figure 7
#20
Right
Handrail
Setup
and Assembly
Page 5-7
F. Verify that handrails are now
installed in the correct position as
shown in Figure 10.
#12
#15
Apply
Threadlocker
Linkage Rod
Figure 9
#17
NOTE: The
BHSCS/Threadlocker
(#15) must be tightened
to a minimum of 90
inch-pounds.
#20
#17
Figure 8
#12
Linkage
Rod
#20
#17
#15
#11
#12
Linkage
Rod
Left
Handrail
NOTE: The BHSCS/
Threadlocker (#15)
must be tightened to
a minimum of 90 inch-
pounds.
#15
#11