Owners manual

CyberPower Remote Management System
14
[UPS->Diagnostics] When a power failure occurs, the UPS will supply battery power to all
connected equipment immediately. The UPS must have sufficient runtime for all connected
computers to be shut down properly.
The UPS/Diagnostics page provides the ability to verify the UPS can supply adequate battery
runtime for the connected computers to shutdown properly. Perform a complete runtime calibration
to ensure and accurate estimate of the runtime for the connected load. The buzzer can be tested that
UPS can alarm and indicators can be verified that they can display well as demand of UPS.
Battery Test
The Battery Test will force the UPS to switch to battery power for 10 seconds. This allows the user
to verify the battery conditions and provides information about the battery, including the results and
date of the last battery test. Click the Start button to begin a battery test.
Performing a battery test is prohibited when the Frequency Working Mode option is set to fixed.
If performing a battery test on the fixed frequency mode, a UPS fault may occur and cause the UPS
to enter Bypass mode. The frequency on Bypass mode may not be accepted and may damage the
connected equipment.
The results will be reported after a battery test completes.
Last Test Date: The date the most recent running battery test.
Last Test Result: The results of the most recent battery test.
Passed: The battery performs normally during the test.
None: The UPS has never performed the battery test.
Failed: The battery test results in failure.
Follow the steps below if the battery test fails:
Repeat the battery test and replace the batteries if the test fails again.
Contact CyberPower for assistance if the battery test fails after the batteries have been
replaced.
Runtime Calibration
The Runtime Calibration ensures the runtime estimate is accurate with the load and the current
battery capacity. The results show the runtime, the results, and the date of the last calibration.
When a runtime calibration is initiated, the connected equipment will be run on battery power until
the batteries are completely discharged. The batteries will be then automatically recharged following
the calibration.
Users can click the Start button to initiate a runtime calibration. Click the Cancel button to stop
the runtime calibration. The result will be reported after a calibration is finished or canceled.
Estimated Runtime: The estimated runtime of the batteries.
Last Elapsed Runtime: The elapsed time of last Runtime calibration.
Last Calibration Result: The results of the last Runtime calibration.