User Manual
88
Schedule page
Create schedule: Select the New Schedule shortcut to have the blank fields or use the data of the selected
schedule. Enter all required data and click Add to add a new schedule.
Modify the schedule: Select the schedule you wish to modify. After entering the new data, click the Apply button
to apply the schedule modification.
Remove the schedule: Select the schedule to remove from the schedule list, and click the Remove button to
complete the schedule deletion.
The schedule detailed settings are explained below:
Active: Choose Yes to activate this schedule effective. If No is selected, the schedule will be ignored.
Bank: There are two conditions for this option.
Power off the output completely. When users choose the Master Power option, all equipment connected
to the outlets labeled both SURGE and BATTERY, or all the outlets on the UPS includes labeled CL, NCL,
NCL 1, NCL 2 will be turned off. Only the UPS with NCL support the NCL outlets are available, and if there
are two NCL outlets on the UPS, the NCL 1, NCL 2 outlets are available.
Caution: Surge protected outlets provides surge protection to the equipment but does not provide battery
power once a power outage occurs. When utility power fails, computers on the surge outlets will shut down
immediately due to power loss.