User Manual
121
Power Cycle: Click Power Cycle and a popup window appear. Pick the UPS/PDU/ATS from the list and
determine whether to perform an immediate or a sequenced power cycle. Click OK to begin.
A confirmation window of a bulk power cycle operation
Note: If a group contains the UPS systems which has connected with PDU units, a power cycle or a power off to the
selected group will result in computers shutdown on the PDU units.
Battery Test
Only UPS units can perform a battery test. Click Battery Test from the context menu of the selected group. All UPS
units in that group will be listed in the confirmation window. Click OK to initiate the battery test on all selected UPS
units.
Mute
Click Mute from the context menu to mute the alarm.
Alarm
Click Alarm from the context menu to enable or disable the UPS alarm.
IT Equipment Management
IT equipment is computers that have PowerPanel
®
Business Edition Agent or Client installed, or generic equipment
that is powered by a UPS/PDU/ATS. Center provides the following options to attach new equipment to an outlet,
attach existing equipment from another outlet or another device, detach unused equipment and rename equipment
Attach New Computer
When a new computer running Agent or Client is plugged into a UPS/PDU/ATS, it should be assigned to the correct
outlet. Example: A computer running Client connects to outlet #1 on a PDU. The Client should be assigned to an
outlet by following these steps:
Select Show Outlets item from the context menu of the PDU to expand all outlets.