User Manual

120
Note: If a group contains the UPS systems which have connected with PDU units, shutting down the selected
group may cause the computers shutdown on these PDU units.
Power Control
Power Off: Click Power Off and a confirmation window will appear. Pick the UPS/PDU/ATS from the list and
decide whether to perform an immediate or a sequenced power off. Click OK to begin. When the UPS/PDU/ATS
initiates a sequenced power off, computers with Agent or Client installed will initiate a shutdown prior to the
sequenced power off. An immediate power off will likely cause those lose power.
A confirmation window of a bulk power off operation
Power On: Click Power On and a popup window appear. Pick the UPS/PDU/ATS from the list and determine
whether to perform an immediate or a sequenced power on. Click OK to begin.
Note: Some computers require manual booting when a UPS or a PDU powers on. To change this, set the
computers BIOS to boot when power is restored.
A confirmation window of a bulk power on operation