User Manual
116
decade accordingly. Administrators will realize how much energy has been spent in a past period. Energy can be
spent more efficiently and reduce the waste.
For PDU and outlets of Metered by Outlet PDU, the Peak Load value will also be recorded. Center will show the Peak
Load value, the time when this value happens and the time when the Peak Value is reset.
The Energy tab allows administrators to configure the proper thresholds to aware of violating consumption thresholds.
Once the power consumption violates thresholds, Center will warn administrators of the violation. The thresholds are
only applicable to current group or power equipment. When the thresholds are set blank, Center will use the
thresholds of the Default Energy in Energy Consumption/Settings page instead of thresholds in Energy tab.
Note: Internet explorer 6 and lower versions cannot support the graphic chart. The Internet explorer should be
upgraded to the higher version which is capable of rendering the graphic charts.
Device Operations
Center provides management functions for a UPS/PDU/ATS.
Computers on Outlets
Shutdown/Restart: A shutdown or restart can be initiated on a computer with either Agent or Client installed by
going to Shutdown/Restart in Computers on Outlets. A window will list the computers which can be shutdown or
restarted. Clicking “X” will remove that computer from the list and they will not be shutdown/restart.
Note: If a PDU is connected to a UPS, shutting down computers on UPS outlets will result in shutdown computers
in the PDU.
A confirmation window lists computers able to be shutdown