Operation Manual

Working with PowerBackup
21
Using the Scheduler
Use the Scheduler to schedule backup jobs to run at a future time and
date. You can select to run jobs at a regular interval or to run once
only.
Click or use the View > Scheduler command to open the
Scheduler function. The large central pane displays a catalog of
existing backup jobs at the top and details of each record at the
bottom.
On the left-hand side is a list of tasks that can be run from the
Scheduler.