Product specifications
Installing the VoIP Clock Kit Flush Mount Adapter
Mounting the VoIP Clock Kit Flush Mount Adapter
Operations Guide 930284G CyberData Corporation
22
3. Install the version 2 speaker into the flush mount clock kit.
● Use three 8-32 x 1 1/4” mounting screws (from the Ceiling Speaker Drop Ceiling Mounting Kit)
to secure the IP speaker assembly to the wall mount adapter.
Note Make sure that the ribbon and the ethernet cable are both connected to the IP speaker
assembly. If they are not connected, then see the following sections:
• Section 2.1.2, "Moving the Clock Connector Cover Plate"
• Section 2.1.3, "Connecting the Clock to the Speaker"
• Section 2.1.4, "Connecting Power to the Speaker"
Note You can route the Ethernet cable through the back or through the slots at the top or bottom
of the flush mount adapter.
4. Install part number 611038 through the pre-cut drywall into the Atlas sound enclosure.
2.4.4 Uploading the Firmware
Depending on which speaker you are using, please see one of the following documents:
●
VoIP V2 Speaker Operation Guide
●
VoIP V2 Talkback Speaker Operation Guide
These documents are available at the following website addresses:
http://www.cyberdata.net/products/voip/digitalanalog/ceilingspkr2/docs.html
http://www.cyberdata.net/products/voip/digitalanalog/ceilingspkr2talk/docs.html
2.4.5 Setting the Time on the Flush Mount Adapter
Depending on which speaker you are using, please see one of the following documents:
●
VoIP V2 Speaker Operation Guide
●
VoIP V2 Talkback Speaker Operation Guide
These documents are available at the following website addresses:
http://www.cyberdata.net/products/voip/digitalanalog/ceilingspkr2/docs.html
http://www.cyberdata.net/products/voip/digitalanalog/ceilingspkr2talk/docs.html