Specifications
OZONE/MAZZEI AFTER-MARKET
INSTALLATION INSTRUCTIONS CONTINUED
Glue and clamp (ie: Ideal) the Ozone/Mazzei injector
(4A & 4B)
Install ozone generator by screwing it to the closest up-
right (4C), and attach check valve (4D) to the 1/4” clear
tubing from the generator to the Ozone/Mazzei injector,
making sure the flow arrow on the check valve is pointing
towards your Mazzei injector.
If using an ozone generator other than the one supplied
(because injector sizes vary) it is recom-mended to check
the STANDARD CUBIC FEET PER HOUR to a target draw
between .1 and .5 to achieve the maxi-mum effectiveness
of the ozone produced.
View of Ozone/Mazzei injector installed. See Figure 5
QR Code and link to Grainger Industrial Supply for
purchasing a flow meter:
www. Grainger.com
Search 2KTU6
7
8
9
10
Figure 4A
Figure 4B
Figure 4C
Figure 4D
Figure 5