Specifications
OZONE/MAZZEI AFTER-MARKET
INSTALLATION INSTRUCTIONS
Verify that ALL electrical power is disconnected to spa!
Lower spa water level to bottom of skimmer opening!
Remove the three front cabinet panels to expose pump(s)
and power pack.
Locate clear 3⁄4” pvc line that is located near the top of the
spa with a “FLOW” indicator label affixed. See Figure 1.
Cut this line to the length indicated to install
Ozone/Mazzei venturi injector. See Figure 2A & 2B
Make certain that the direction arrow on the venturi injec-
tor matches the direction arrow on the label affixed to the
clear pvc tubing in Figure 3
1
2
3
4
5
6
Figure 1
Figure 2A
Figure 2B
Figure 3