User guide

Enclosure User Guide
62
4.11.2 Installing an FC60SS RAID Module
Important Host and Expansion Connectors:
Class 1 Laser Product
If fitted with optical modules, the modules must be a UL (or other North American NRTL)
RECOGNISED COMPONENT, must be approved by TUV (or other European Product safety
test house) and the laser in the module must comply with Laser Class 1, US 21 CFR (J) & EN
60825-1.
EMC Precautions:
If passive copper cables are connected, the cable must not have a connection to a common
ground/earth point.
1 Check for damage, especially to the interface connector - do not install if the pins are bent.
2 With the latches in the open position (see Figure 4–10), slide the FC60SS RAID module into the enclosure
until the latches engage automatically (Figure 4–11).
Figure 4–10 FC60SS RAID Module Latch Operation
Figure 4–11 Installing a FC60SS RAID Module (step 2)