Service manual

Symbols
WARNINGS – To help avoid personal injury
Important Notes/Cautions – from the factory
Sanitation Requirements
1
Service Manual, Milano Single Head Coffee Brewer
FOR THE LATEST SPECIFICATIONS AND INFORMATION GO TO WWW.WILBURCURTIS.COM
Important Safeguards & Symbols
This appliance is designed for commercial use. Any servicing other than cleaning and maintenance should be performed by an autho-
rized Wilbur Curtis service center.
• Do NOT immerse the unit in water or any other liquid
•To reduce the risk of re or electric shock, do NOT open top or side panels. No user serviceable parts inside. Repair should be
done only by authorized service personnel.
•Keep hands and other items away from hot parts of unit during operation.
• Never clean with scouring powders, bleach or harsh implements.
The Curtis Milano Brewer is Factory Pre-Set and Ready to Go… Right from the Carton.
Following are the Factory Settings for your Coffee Brewing System:
• Brew Temperature = 200°F • Water Bypass = On for LARGE & MEDIUM Brew Only
• Brew Volume = Set to Vessel Requirement. • Sleep Mode = Off
System Requirements:
• Water Source 20 – 90 PSI (Minimum Flow Rate of 1 GPM)
• Electrical: See attached schematic for standard model or visit www.wilburcurtis.com for your model.
SETUP STEPS
The unit should be level (left to right and front to back), located on a solid counter top. Connect a water line from the water lter to the
brewer. NOTE: Some type of water ltration device must be used to maintain a trouble-free operation. (In areas with extremely hard
water, we suggest that a sedimentary and taste & odor lter be installed.) This will prolong the life of your brewing system and enhance
coffee quality.
1. A 3/8” NPT x 3/8” Flare elbow has been supplied for water line connection. Use tubing sized sufciently to provide a minimum of
1.0 GPM.
2. To hookup the InterLock grinder, Locate the jack labeled “Class 2 Wiring Only” on brewer and grinder. Connect the two with the
cable plug.
3. Connect the unit to an appropriate electrical power circuit.
4. Turn on the toggle (STANDBY/ON) switch behind the unit. The heating tank will start to ll. When the water level in the tank rises
to the correct volume, the heating elements will energize automatically. With the G4 system there is no danger of element burnout
caused by an empty tank.
5. The heating tank will require 20 to 30 minutes to reach operating temperature (200°F). You will be notied when READY-TO-
BREW appears on the control panel LCD screen.
6. Prior to brewing, dispense 12 ounces of hot water through the hot water faucet.
7. Brew a cycle of at least 12 ounces, to purge the water lines of any air that may be trapped after lling.
NSF International requires the following water connection:
1. A quick disconnect or additional coiled tubing (at least 2x the depth of the unit) so that the machine can be moved for
cleaning underneath the unit.
2. Thisequipmentistobeinstalledwithadequatebackowprotectiontocomplywithapplicablefederal,stateandlocal
codes.
3. Waterpipeconnectionsandxturesdirectlyconnectedtoapotablewatersupplyshallbesized,installedandmaintainedin
accordancewithfederal,state,andlocalcodes.
Wilbur Curtis Company, inC.
WILBUR CURTIS COMPANY
Montebello,CA90640
Models Included
u TPC2S
CAUTION: DO NOT
connect this brewer to
hot water. The inlet valve
is not rated for hot water.
CAUTION: Please use
this setup procedure
before attempting to use
this brewer. Failure to follow the
instructions can result in injury or the
voiding of the warranty.
WARNING TO AVOID
SCALDING,Donot
remove brewcone while
brewlightisashing.
ISO 9001 REGISTERED
IMPORTANT: Equipment
to be installed to comply
withapplicablefederal,
state,orlocalplumbing/electrical
codes having jurisdiction.
BREWING INSTRUCTIONS
1. Brewer should be ON (Conrm at rear toggle switch, then press the ON/OFF button). Ready-to-Brew should read on the LCD screen. If
connected to an InterLock grinder, grinder should be on. Grind coffee at this time.
2. Place an empty Milano server under the brew cone.
6. Press the brew button
to start the brew
cycle.
5. Slide the lled brew
cone to the brew
rails.
3. Place a new paper lter
into the brewcone.
4. Fill the brew cone
with correct amount
of ground coffee.

Summary of content (8 pages)