Owners manual

C-529 SUBKIT DODGE RAM 2500, 3500
PARTS LIST
(6) 5/8-11 x 2" Carriage Bolt
(10) 5/8-11 Flange Nut
(2) 5/8" Washers
(6) Installation Spacer (CM-SP9)
(2) Installation Spacer (CM-SP47)
(12) Half Moon Spacer (CM-SP27)
(4) 5/8" Fishwire Tool
(1) Tube Spacer (CM-TS)
(1) CM-C655-EH (Exhaust Hanger)
Curt Manufacturing Inc., warrants this product to be free of defects in material or workmanship at the time of retail purchase by the original purchaser. If the product is found to be defective,
Curt Manufacturing Inc., may repair or replace the product, at their option,when the product is returned, prepaid, with proof of purchase. Alteration to, misuse of, or improper installation of
this product voids the warrant. Curt Manufacturing Inc.'s liability is limited to repair or replacement of products found to be defective, and specifically excludes liability for incidental or
consequential loss or damage.
10) Remove template and drill out the six pilot holes with a 21/32" drill bit. Set your C-52 folding hitch ball into place.
11) Attach the C-52 to the cross arms using six 5/8" carriagge bolts and flange nuts. Torque bolts to 115 lb-ft. (Note: Shims (Half
moon spacers) must be placed under each bolt between cross arms and C-52 to prevent truck bed corrugations from
collapsing.)
12) After the C-52 has been fastened to the cross arms, torque all 5/8" hardware to 115 lb-ft.
13) Using side plate as a template, drill remaining mounting holes with an 11/16" drill bit.
14) Fishwire remaing 5/8" hardware and torque to 150 lb-ft.
PAGE 2
INSTALLATION STEPS CONT.
C-52 TOP PLATE
HALF MOON SPACER
Shim may need to be located
underneath truck between
cross arm and truck bed
CROSS ARM FLANGE
TRUCK BED
CROSS ARM
C-52 CUT OUT
C-52 DRILLING TEMPLATE
7/16/2010
30,000 LBS GTW GOOSENECK KIT