Installation Guide
5. Using the fishwires as a guide raise hitch into position.
Remove fishwires and loosely attach 7/16" flange
nuts. Hitch will be placed between frame rail and Note:
heat shield.
6. Place 1/2" carriage bolt with CM-SP6 spacer through tow
loop and hitch and secure hitch to tow loop with 1/2" flange
nut.
7. Torque all 7/16" hardware to 70 ft-lbs and all 1/2" hardware
to 110 ft-lbs.
8. Reinstall the two M8 nuts removed in step 1.
CAUTION: BALLMOUNT MAY BECOME HOT DUE TO
CENTER EXHAUST! ELECTRICAL WIRING
MUST BE A MINIMUM OF 12" FROM
EXHAUST TIPS!