Owner`s manual
16 17
www.CurrieTech.com
Currie Technologies
®
Currie Technologies
®
OM Direct Drive Scooters - 2012.indd 
Modied 05/25/2012
using the Currie “Smart Charger”, we 
recommend that you do not leave the 
charger plugged in for more than 24 
hours.
CHANGING THE BATTERY PACK
1.  IMPORTANT: Be sure the power 
switch on the scooter is in the 
“OFF” position. 
2.  Remove the deck by unscrew-
ing the “D” ring deck retention 
screw then lifting the deck off. 
(Ref Photo A)
3.  Remove the battery pack out of 
the scooter’s battery tray. (Ref 
Photo B)
4.  Disconnect the battery power 
pack connector (cut zip tie 
holding the wire connector, if 
necessary) (Ref Photo C)
5.  Place the new or fully charged 
battery pack into the battery 
tray.
6.  Reconnect the battery pack 
connector and place all of the 
cables into the tray.
7.  Re-install the deck and secure 
with the “D” ring deck retention 
screw.
Photo A
Photo B
Photo C
BATTERY CARE AND MAINTENANCE
Not doing any and/or all of the following may lead to reduced performance 
and/or permanent damage to the batteries. Batteries that have been 
damaged by not following the below steps will need to be replaced and are 
not covered under warranty.
•  Always be sure to fully charge batteries before first use (6-10 
hours depending on size). 
•  Always be sure to fully charge batteries after each and every use 
(6-10 hours depending on size).
•  Be sure to charge batteries at least every 30 days.
•  Do not store batteries below 50º Fahrenheit and never allow 
batteries to freeze (below 32º Fahrenheit).
•  Always be sure to turn the scooter “OFF” after each use via the 
On/Off power switch.
SLA (SEALED LEAD ACID) BATTERY CONDITIONING
SLA batteries should always be fully charged (charge time of 6-10 hours 
depending on amperage of battery) before first use. This will help obtain 
optimum performance.
SLA batteries have a “break-in” cycle consisting of ~ three discharge/charge 
cycles before they will reach optimum performance. This involves three 
complete discharges and three complete recharges (charge time of 6-10 
hours depending on amperage of battery and strength of the charger). After 
this initial “break-in” cycle the batteries will have increased performance and 
less line voltage fluctuations under load, as indicated by the throttle LED’s.
FUSE
In the event of an overload the fuse will pop and need to be replaced. In this 
instance replace only with approved part from Currie Technologies
®
.
Risk of fire, Do not bypass fuse.
WARNING
!










