Technical information
32 33
www.CurrieTech.com
OM Chain Drive Scooters - 2012.indd
Modied 05/25/2012
Currie Technologies
®
Currie Technologies
®
7. To reassemble the front wheel, first slightly inflate the tube to allow it
to take shape then install into the tire.
8. Insert the valve thru the hole in the rim.
9. Push (by hand only) one side of the tire and tube all the way over and
onto the rim.
10. With a bicycle tire lever seat the other side of the tire onto the rim. Be
sure not the pinch (tube puncture caused by being caught between the
tire and rim) the tube.
11. Inflate the tire slowly to the recommended tire pressure. Inspect the
tire during inflation to ensure it is seating onto the rim properly.
(if your scooter is equipped).
11. Slide the axle through one half of the rim, and place the center (lon-
ger) axle sleeve over the axle at the center of the two rim halves.
12. Bolt the two halves of the rim together with the 5mm Allen bolts.
13. Place the remaining axle sleeve and 17mm nut over the end of the
axle. Center the axle by hand, then tighten both 17mm nuts against
each other.
14. Inflate the tire slowly to the recommended tire pressure. Inspect the
tire during inflation to ensure it is seating onto the rim properly.
FRONT AND REAR WHEEL
500CD, 650CD, 750CD AND 900CD
SERIES SCOOTERS
Do not use a flat
screwdriver or other sharp metal tool
to remove the tire from the rim as this
may cause damage to the rim, inner
tube and/or tire.
1. To remove the front wheel refer
to page 24 then proceed to step
3.
2. To remove the rear wheel refer
to pages 26-27 then proceed to
step 3.
3. With a bicycle tire lever unseat
one side of the tire from the rim.
(Ref Photo A, B, C)
4. Remove the tube from the tire.
5. Slightly inflate the tube in order
to inspect for leaks or punc-
tures. Patch or replace the tube
as necessary.
6. Carefully check the inside of
the tire and remove any sharp
objects or debris that caused
the puncture. If the tire is cut
through in any place replace it
WARNING
!
Photo A
Photo C
Photo B