Technical data

Once the engineering of the IED is done, the results must be written to the IED.
Conversely some parts of the engineering information can be uploaded from the IED
for various purposes.
The connection between the physical IED and PCM600 is established via an Ethernet
link on the front or rear port on the IED.
1MRK 511 261-UUS A Section 2
Engineering tool set
650 series ANSI 21
Engineering Manual