Installation manual
3. Step-By-Step Outline of Installation 4-2010
3.1.2.2 Tools Required
Use a forklift to move the generator set and set it in place. Alternatively, a one-man hand dolly
designed to fit the generator set base is available to move the generator set and set it in place.
Hand tools required include the following:
· Wire stripper for terminating the communications wires
· Torque wrench
· Jewelers screwdriver
· Allen wrench
· Ratchet set with 10 mm socket and extension
· Two pipe wrenches for gas connections
· Phillips-head and flat-blade screwdrivers
3.1.3 Choosing A Transfer Switch
Block diagrams showing partial or full load coverage are shown on the following pages:
· UL 1008 listed, Service Entrance Rated Automatic Transfer Switch (without controller):
· RSS 100-6868
· RSS 200-6869
· CSA Approved and UL 1008 listed (with controller):
· RSS 100-6634
· RSS 200-6635
· UL 1008 listed, Service Entrance Rated (without controller):
· RSS 100-6868
· RSS 200-6869
NOTE: If the transfer switch is connected for full load coverage which exceeds the
generator set rating, it may be necessary to shed large loads such as air
conditioners.
NOTE:
· The RSS 100 transfer switch models can be connected for full or partial
load coverage equal to the capacity of the generator set.
· The RSS 200 transfer switch models can be connected for full load
coverage greater than the capacity of the generator set.
TABLE 14. TRANSFER SWITCH CONNECTION VS. LOAD COVERAGE
Transfer Switch Model Connection Capabilities
Full Load Full or Partial Load
(Greater Than Capacity of Genset) (Equal to Capacity of Genset)
RSS 100-6634 X
RSS 200-6635 X
RSS 100-6868 X
12 A029V088 (Issue 2)