Spec Sheet
Our energy working for you.™ 
www.cumminspower.com
©2009 Cummins Power Generation. Cummins and PowerCommand are registered trademarks of Cummins Inc. 
Specifications are subject to change without notice. 
SG-1478j (6/09) 
Microprocessor control 
•  Simple, easy-to-use control provides transfer switch information and 
operator controls 
•  LED lamps for source availability and source connected indication, exercise 
mode, and test mode. LED status lamps also provided for control set-up 
and configuration 
•  Pushbutton controls for initiating test, overriding time delays and setting 
exercise time 
•  Field-configurable for open or programmed transition 
•  Integral exerciser clock 
•  Control is prototype-tested to withstand voltage surges per EN 60947-6-1 
•  Gold-flashed generator start contacts 
Control functions 
Under-voltage sensing: All phases on the normal source, 
and single phase on generator source. 
Normal source pickup: adjustable 80-95% 
Dropout: adjustable 70-90% of nominal voltage 
Generator source pickup: 90% 
Dropout: 75% of nominal voltage. 
Over-voltage sensing: All phases on the normal source. 
Source pickup: 120% 
Dropout: 125% 
Under-frequency sensing: Default setting is OFF. 
Generator source pickup: 90% of nominal frequency 
Dropout: 85% of nominal frequency 
Normal source pickup: 80% 
Dropout: 70% 
Over-frequency sensing: Default setting is OFF 
Normal source pickup: 130% 
Dropout: 140%. 
Genset-to-genset sensing: Same functions as above, for 
lead and secondary generators. 
Exercise mode: The control exerciser clock can be set to 
operate on a 7, 14, 21 or 28-day cycle with a fixed exercise 
period duration of 20 minutes. A convenient 12-hour offset 
feature offsets the exercise time by 12 hours, without having 
to reprogram the timer. The control can be programmed to 
exercise the generator with or without load. 
Test mode: When manually or remotely activated from the 
control panel, the control will start the generator and run 
until stopped. Can be configured to test with or without load. 
Transition modes 
Open transition/programmed: Controls the time 
required for the device to switch from source to source, so 
that the load-generated voltages decay to a safe level before 
connecting to an energized source. Recommended by 
NEMA MG-1 to prevent nuisance-tripping breakers and load 
damage. 
Adjustable 0-10 seconds, default 0 seconds. 
Open transition/in-phase: Initiates open transition 
transfer when in-phase monitor senses both sources are in 
phase. Operates in a break-before-make sequence. Includes 
ability to enable programmed transition as a back-up. If 
sources are not in phase within 120 seconds, the system will 
transfer using programmed transition. 
Time-delay functions 
Engine start: Prevents nuisance genset starts due to 
momentary power system variation or loss. 
Adjustable 0-10 seconds, default 3 seconds. 
Transfer normal to emergency: Allows genset to 
stabilize before application of load. Prevents power 
interruption if normal source variation or loss is momentary. 
Allows staggered transfer of loads in multiple transfer 
switch systems. For genset-to-genset applications, delays 
transfer of load from lead to secondary generator. 
Adjustable 0-300 seconds, default 5 seconds. 
Re-transfer emergency to normal: Allows the utility to 
stabilize before re-transfer of load. Prevents needless 
power interruption if return of normal source is momentary. 
Allows staggered transfer of loads in multiple transfer 
switch systems. For genset-to-genset applications, delays 
re-transfer of load from secondary back to lead generator. 
Adjustable 0-30 minutes, default 10 minutes. 
Engine stop: Maintains availability of the genset for 
immediate reconnection if the normal source fails shortly 
after transfer. Allows gradual genset cool down by running 
unloaded. 
Adjustable 0-30 minutes, default 10 minutes. 
Elevator signal relay: Requires optional elevator signal 
relay (M032). Delays transfer for specified interval to 
prevent a power interruption during elevator operation. 
Options 
Elevator signal relay: Provides relay output contacts 
for sending a load-disconnect warning signal to the 
elevator control. Transfer/re-transfer delay time is 
selectable for 0, 1, 2, 3, 5, 30, 120 or 300 seconds. (M032). 
Programmable exerciser clock: Provides a fully-
programmable 7-day clock to provide greater flexibility in 
scheduling exercise periods than standard integral 
exerciser. Peaking function feature allows for generator 
operation during periods of high utility rates. (J030) 
Manual restore:  Provides a key switch on the front door 
to allow the operator to control when the switch transfers 
to the available normal source. 






