Product Manual A

6. Startup and Configuration PCC 2.3 7-2018
82 A051X873 (Issue 10)Copyright © 2018 Cummins Inc.
TABLE 23. INITIAL PRE-START CHECKS
Check Description
Generator Set
Grounding
Grounding (earthing) must be checked prior to performing service or
inspection procedures that may expose personnel to conductors normally
energized with voltages greater than 600 Volts. Contact your authorized
Cummins distributor.
Insulation
Testing
1
This must be performed on all generator sets before initial start-up and after
the generator set grounding procedure has been completed. Insulation
testing for low voltage (less than 600 Volts) generator sets is recommended
by Cummins. These tests are used to verify that the windings are dry before
the generator set is operated, and to develop a base line for future test
comparisons. Contact your authorized Cummins distributor.
Lubrication
2
Check the engine lubrication oil level and ensure that the correct level is
always maintained.
Coolant
3,4,5
Check the engine coolant level and ensure that the level is always
maintained. Fill the cooling system to the bottom of the fill neck in the
radiator fill or expansion tank. Do not check the level while the engine is hot.
1
When wire insulation-testing an alternator, failure to protect the voltage regulator, control
and diodes could result in permanent damage to one or more of the electronic components.
2
Generator sets shipped dry only: They must be filled with the correct type and quantity of oil
before use. Be sure to check the oil level before initial start. Failure to fill to the
recommended level can result in equipment damage.
3
Generator sets that require a mix of anti-freeze and DCA inhibitor only: You must comply
with Cummins requirements for the correct type and concentration of anti-freeze and DCA
inhibitor. Warranty claims for damage will be rejected if the incorrect mix is used. Consult
your authorized Cummins distributor for the correct anti-freeze specifications and
concentration for your operating conditions.
4
Radiators with two fill necks only: Both fill necks must be filled after the cooling system has
been drained.
5
Generator sets shipped dry only: The engine must be filled with the correct type and
quantity of coolant before use. Be sure to check coolant level(s), before the initial start.
Operator’s Pre-Start Checks
WARNING
Arc Flash and Shock Hazard
Electric arc flash can cause electrical shock, severe burns, or death.
Make sure the alternator is dry before the generator set is operated.