Product Manual A
4. Installation7-2018
27A051X873 (Issue 10) Copyright © 2018 Cummins Inc.
NOTICE
Seismic installation may require a different pad and securing
devices.
NOTICE
Local codes and standards may have different requirements.
4. Lift the generator set onto the pad, and secure it.
No. Description No. Description
1 Pad Length (Must Extend Minimum
152 mm/6 in Beyond Skid)
6 Circuit Breaker 3 Stub-Up (Optional)
2 Pad Width (Must Extend Minimum 152
mm/6 in Beyond Skid)
7 1.5 m/5 ft Clearance (Shaded Area)
3 Pad Thickness (Minimum 127 mm/5 in) 8 Accessory 120 VAC, 20A Max Wire
Stub-Up (240 VAC, 15A for High
Wattage Coolant Heater)
4 Circuit Breaker 1 Stub-Up 9 Generator Set Control Wire Stub-Up
(DC)
5 Circuit Breaker 2 Stub-Up (Optional)
FIGURE 3. CONCRETE PAD PREPARATION