Product Manual A

4. Installation7-2018
31A045R241 (Issue 13) Copyright © 2018 Cummins Inc.
Position the generator set so that cooling air is free to enter and leave the area.
Locate and position the generator set so that prevailing winds carry exhaust
gases and potential fuel leaks away from the house or occupied area.
NOTICE
For all clearance requirements, refer to the Outline and System Drawings
section.
Laying the Foundation
When laying the foundation:
1. Clear obstructions, and make sure that there is adequate clearance for access.
2. Level the ground, and make sure that the ground is compact and settled.
Ensure that it is stable ground, not subject to flooding.
3. Prepare the concrete pad.
The pad should be constructed of reinforced concrete with a 28-day
compressive strength of at least 2500 psi (17,237 kPa).
The pad dimensions should be the same as those indicated in the Outline
and System Drawings appendix.
NOTICE
Seismic installations may require a different pad and securing
devices.
NOTICE
Local codes and standards may have different requirements.
4. Lift the generator set onto the pad, and secure it.
Lifting and Moving the Generator Set
WARNING
Heavy Load
The generator set is heavy. Handle with care.
Dropping the generator set can cause severe personal injury or death. Use
appropriate lifting techniques to move the generator set. Keep feet and
hands clear when lifting the generator set.
CAUTION
The generator set is shipped with oil in the engine crankcase. Keep the
generator set upright.