A complete system test is recommended to verify that the electrical system is
working properly. Testing the system once every 200 hours or every 2 years is
required to make sure the transfer switch will transfer the load to the generator set if
there is a utility power failure. For more information, see the transfer switch owner
manual.
To initiate a complete system test:
1. Before starting:
• Check the oil level.
• Verify that fuel related components, such as manual valves, outside of the
generator set are open.
• See the Checklist section in the installation manual.
2. Place the generator set in Standby mode.
3. Switch the main utility disconnect from the ON to the OFF position.
4. Make sure the following occurs:
a. The generator set starts.
b. After the generator set starts and stabilizes, the load is transferred from the
utility to the generator set.
5. Switch the main utility disconnect from the OFF to the ON position.
6. Make sure the following occurs:
a. After approximately 5 minutes, the load is transferred back to the utility.
b. Once the transfer switch is connected to utility power, after approximately 5
minutes, the generator set stops.
NOTICE
If the test fails, call your authorized Cummins service provider to fix the
problem.