Product Manual A

4. Operation11-2017
270962-0131 (Issue 6) Copyright © 2017 Cummins Inc.
7. When the generator output is acceptable (the Generator set Power Available LED is lit) the control
starts the TDNE timer.
8. After the TDNE timer expires, the transfer switch transfers to the generator set (the Generator set
Power Connected LED is lit).
9. The control continues to run the generator with the transfer switch connected to the generator set
until the control panel Test pushbutton is momentarily pressed or the ground is removed from the
Remote Test input.
10. After this action, the control starts the TDEN timer. The Test LED flashes twice per second for two
seconds to acknowledge the operation and then the Test LED goes out.
11. After TDEN timer expires, the transfer switch retransfers back to the utility (the Utility Power
Connected LED is lit).
12. Once the transfer switch is connected to utility power, the control starts the TDEC timer.
13. After the timer expires, the control energizes the start relay, opening the start contact to signal the
generator to stop.
4.3.3 Test Without Load - Sequence of Events
The following describes the sequence of events of a transfer switch during a test without load.
In this example, the generator is started and runs without load for the duration of the test.
The utility must be acceptable during the entire test event. Acceptability is determined by the active source
sensor (under-voltage sensor). If, at any time, the under-voltage sensor determines that the utility is not
acceptable, the test is terminated.
Before a test can begin, the transfer switch must be connected to the utility power source and utility power
must be available.
1. Verify that the transfer switch is set to test without load.
2. Verify that the green Utility Power Connected LED on the control panel is lit.
3. Verify that the green Utility Power Available LED on the control panel is lit.
4. Press and hold the control panel Test pushbutton for two seconds or ground the Remote Test input
to initiate the test. The Test LED flashes two times per second for two seconds, acknowledging that
the test was activated. Once the test period starts, the Test LED stays on continuously.
5. The control de-energizes the start relay, closing the start contact to signal the generator to start.
When the generator set starts and produces power, the amber Generator set Power Available LED
lights.
6. The control continues to run the generator without load until the control panel Test pushbutton is
momentarily pressed or the ground is removed from the Remote Test input.
7. After the control panel Test pushbutton is momentarily pressed or the ground is removed from the
Remote Test input, the control flashes the Test LED twice per second for two seconds to
acknowledge the operation and then goes out.
8. The control energizes the start relay, opening the start contact to signal the generator to stop.
4.4 Sensors
4.4.1 Utility Sensor
The utility sensor monitors all phases of the utility for under-voltage conditions. Both the pickup and
dropout set points are adjustable. The set points are listed in the following table.