Service Manual

Table Of Contents
5. Maintenance10-2019
85A062J683 (Issue 1) Copyright © 2019 Cummins Inc.
2. Place the generator set in Standby mode.
3. Switch the main utility disconnect from the ON to the OFF position.
4. Make sure the following occurs:
a. The generator set starts.
b. After the generator set starts and stabilizes, the load is transferred from the
utility to the generator set.
5. Switch the main utility disconnect from the OFF to the ON position.
6. Make sure the following occurs:
a. After approximately 5 minutes, the load is transferred back to the utility.
b. Once the transfer switch is connected to utility power, after approximately 5
minutes, the generator set stops.
NOTICE
If the test fails, call your authorized Cummins service provider to fix the
problem.