Service Manual

Table Of Contents
4. Operation 10-2019
50 A062J683 (Issue 1)Copyright © 2019 Cummins Inc.
FIGURE 18. UTILITY RE-TRANS
5. When utility power is stable for 5 minutes, the transfer switch connects
the building load back to utility power.
FIGURE 19. UTILITY RETURNED
6. The generator set runs an additional 5 minutes to cool down and then
shuts off.
FIGURE 20. ENGINE COOLDOWN
7. Normal operation resumes. See Figure 15.
Exercise Sequences
1. Standard Exercise sequence:
NOTICE
Standby Mode must be enabled for standard exercise to execute.