Quick Start Installer

A062M459 (Issue 2) 7-2019 Page 5 of 6 Copyright © 2019 Cummins Inc.
STARTUP
Generator Set Pre‐Start Checklist
The generator set engine is properly serviced with oil.
All generator set and ATS covers and safety shields are installed correctly.
All fuel shutoff valves are operational and in the open position.
The installation meets all applicable local, state, and federal codes.
Setting the Date, Time and Exercise Mode
1. From the Main screen of the local display, select Menu.
2. Use the arrow keys to highlight Clock. Select the ENTER key.
3. Use the arrow and NEXT keys to set the date and time.
4. Follow the Exercise menu to set up the exercise mode. See the installation manual for more information.
Note: Crank exercise is enabled as a default. During every other exercise cycle the generator will not start. See the Installation
manual to disable.
Setting the Remote and Standby Modes
Enable/Disable Remote or Standby (Local Display)
Enable/Disable Standby (Remote Display)
1. From any screen, select the Mode key to get to the Mode
screen.
2. Use the arrow keys to enable or disable the Remote mode.
Select theNext key to go to the next screen.
3. Use the arrow keys to enable or disable the Standby mode.
4. Whenever Standby is enabled, the Remote mode
will also automatically be enabled.
5. Keep pressing the Back button to save the settings and return
to the
Main screen.
1. From any screen, select the Mode key to get to the
Mode screen.
2. Use the arrow keys to enable or disable the
Standby mode. (Local display needs to be in
remote to enable or
disable Standby.)
3. Keep pressing the Back button to save the
settings and return to the Main screen.
Control Checklist
Verify that the display has been configured to “local”, and that the clock, exerciser and correct fuel type are set.
Manual Starting and Stopping
Action
Manual Start (Local)
Manual Start (Remote)
Start
1. From the Main screen, select the START key.
2. A second screen appears notifying the operator that Standby will be
disabled. Select the START key again to start the generator set.
3. After the generator set reaches rated voltage and frequency, the
transfer
switch transfers the building load to the generator set.
The building's electrical power is now provided by the generator
set.
Remote mode must be enabled on the
local display to allow manual start and
stop from
the Remote display. The
manual start and stop sequences are
the same for the Remote
display and
the Local display.
Stop
Press the red STOP button on the local display. The generator set
will stop immediately and the building load will be transferred to
the utility.
Note: For normal operation to resume, Standby will need to be enabled.
Note: Press the generator set's red STOP button on the local display to stop the generator set, which will disable both Remote and
Standby Modes.