Install Manual

Page 11 of 11A051D263 (Issue 4) Copyright © 2017 Cummins Inc.
NOTICE
For information on setting up the control, see the load management information in the
service manual related to the specific model.
5. Replace the covers over the load shed box and the main service entrance circuit breaker or fuse
panel.
6. Reconnect the main service entrance circuit breaker or fuse.
7. Test loads. Load should be connected to the AC supply with the generator set off and be
disconnected when the generator set starts.