User guide

34 T2
®
If the unit has been torn down completely, the
following summary identies the assembly pro-
cedures necessary to completely assemble the
unit. Each assembly procedure is located by a
page reference.
The part reference numbers provided in each
assembly procedure are keyed to the individual
procedure illustrations, and are also keyed to
the complete unit exploded view on page 36.
1. Install the expansion tank hose and tting.
See page 33.
2. Install the LH axle assembly. See page
32.
3. Install the lter assembly, cylinder block and
motor shaft. See pages 30-31.
4. Install the bypass arm. See page 29.
5. Install the pump block and swash plate. See
page 28.
6. Install the input shaft. See page 27.
7. Install the reduction gear set. See page
26.
8. Install the bull gear set. See page 25.
9. Install the RH axle assembly. See page
24.
Figure 28, Sealant Application Diagram
ASSEMBLY AFTER A COMPLETE TEAR DOWN
10. Apply sealant to the main housing prior to
assembly with the side housing. See page
34.
NOTE: Prior to applying the new sealant, the
old sealant must be removed from all
surfaces.
A small consistent bead (approx.
1/16 1/8 inch) of the sealant around
the housing face will be sufcient. Use
sparingly.
The illustration below indicates the cor-
rect sealant path.
11. Install the brake assembly. See page 22.
12. Install the control arm (RTN) assembly. See
pages 19-21.
13. Install the expansion tank. See page 18.
14. Fill transaxle with clean oil.
15. Install the fan and pulley assembly. See
page 17.
16. Install the transaxle into the vehicle.
17. Perform the purge procedures listed on
page 11.
Sealant Path for Main Housing