Operator`s manual

 Loosen, but do not remove the belt keeper rod on the
pulley located near the back of the deck. See Fig. 7-9.
4. Carefully remove the deck belt from around the three
spindle pulleys and the two deck idler pulleys.
5. On 50” Decks: To place the new belt, begin by routing the
belt around the two outer spindle pulleys, then around the

6. Then route the belt around the two deck idler pulleys as

7. On 46” Decks: To place the new belt begin by routing the
belt around the two outer spindle pulleys as shown in Fig.

8. Then route the belt around the two deck idler pulleys as

9. Reinstall the belt keeper rod loosened earlier.
CAUTION: Failure to reinstall the belt keeper rod

system.
 Remount the belt guards removed earlier.
 Re-install the deck making sure the belt remains routed
around the pulleys as instructed.
 Pull the right side of the belt and place the narrow V side of

 While holding the belt and pulley together, rotate the
pulley to the left. Continue holding and rotating the pulley

Outer Spindle
Pulleys
Front Spindle
Pulley
Deck Idler
Pulleys
Figure 7-11
PTO Belt
Rotate
Pulley
Figure 7-13
Outer Spindle
Pulleys
Deck Idler
Pulleys
Figure 7-12
28
Section 7— Service