Product Manual

8 Section 3 — ASSembly & Set-Up
2. Pull spring loaded pin out on the base and align pin with the first
hole (closest to the end of the tube) in the hose adapter.
See Fig. 3-4B.
3. Release the pin to lock the hose in place.
4. Lay hose tubing in curved end of hose handle next to chipper
chute and into hose cradle. See Fig. 3-5A & B.
5. Snap the hose handle first into the upper hose handle bracket
and then into the lower hose handle bracket. See Fig. 3-5C.
4. Loosen the wing nut that secures the rope guide to the
right side of upper handle.
a. Slowly pull starter rope out of engine.
b. Slip the starter rope into the rope guide. Tighten the
wing nut. See Fig. 3-3.
Hose Assembly
1. Slide hose adapter of hose assembly into the base adapter
located on the left front of the Chipper shredder Vacuum.
See Fig. 3-4A.
A
B
Figure 3-3
Figure 3-4
A
B
Align Pin with
this Hole
Figure 3-5
C
A
B