Service manual

CHAPTER 9 8354/8404
9-18
D615-W03 May-2003
615W921A
615W920B
10.1 HYDRAULIC BLOCK
A: To implement control valve “IN” port
B: From implement control valve “TANK” port
C: Without attaching implement
D: With attaching implement
NOTE:
When an implement is not attached, turn the slit on
the spool end to the horizontal position fully.
Remove the plugs from the OUT port (2) and IN port
(1) of the front hydraulic block (4).
Install the hydraulic take off adaptors (screw size
PT 3/8) to OUT port and IN port.
Connect the hydraulic hose to the adaptor (OUT port
side) and to the implement control valve IN port.
Connect the other hydraulic hose to the adaptor (IN
port side) an to the implement control valve TANK
(RETURN) port.
Turn the slit on the spool (3) end to the arrow side
fully as shown in the figure.
[A] To the Remote Valves
[B] From the Pump
(1) Inflow Port
(2) Outflow Port
(3) Spool
(4) Hydraulic Block Body
10. OUTSIDE HYDRAULIC EXTRACTION
www.mymowerparts.com
K&T Saw Shop 606-678-9623 or 606-561-4983