Operator`s manual

Assembly
Remove all loose parts before assembling.
Handle Assembly
Place the shift lever in the Forward-6 position1.
Observe the lower rear area of the snow thrower to be sure 2.
both cables are aligned with roller guides before pivoting
the handle upward. Pivot the handle upward. See Fig. 3-1.
NOTE: Make certain the cables are seated properly in the
roller guides. See Fig. 3-2.
Secure the handle by tightening the plastic knob located 3.
on both the left and right sides of the handle. Remove
and discard any rubber bands, if present. They are for
packaging purposes only.
Contents of Carton
One Snow Thrower Two Replacement Auger Shear Pins One Chute Assembly
One Chute Control Rod One Product Registration Card One Engine Operator’s Manual
One Snow Thrower Operator’s
Manual
Figure 3-1
Chute Control Head
Chute
Chute Support
Bracket
Chute Base
Figure 3-3
Figure 3-2
Chute Assembly
Remove hairpin clip, wing nut and hex screw from chute 1.
control head and clevis pin and bow-tie cotter pin from
chute support bracket. See Fig. 3-3.
Assembly & Set-Up
3
7