Solenoid Shift Starting Circuit Test Procedure
REV. 07/23/2008
Before Starting:
Battery voltage should be tested and must be at 12.4 VDC or
higher. Do not proceed if battery voltage is less than 12.4
VDC as battery should be charged.
Test meter leads before u
s
e. (Set meter
to Ohm’s and check
for r
esistance reading of less than 0.10 Ohm)
If available, use clamping meter leads to assist with testing.
Set meter to next highest voltage scale that includes 20 VDC.
When taking readings, allow the meter to stabilize before
recording. The reading should stabilize after 3 to 5 seconds.
If rea
ding continues to drop while cranking, stop the test
and perform a battery load test.
Record Ambient Air Temperature:___________________
Test #2
Voltage Drop Across Battery
(Cranking)
Step 2
VDC
Battery
+-
+-
DVOM
Test #1
Battery Voltage Test
(Static)
Step 1
VDC
Battery
+-
+-
DVOM
Test #3
Voltage Drop Across Starter (Cranking)
VDC
+-
DVOM
Step 3
Step 7
Corrective Actions
If the value for step 5 or 6
is greater than 50% of the
difference in step 4
continue to Step 7.
Oth
erwise the test is
complete.
Test #4
V
oltage Drop Across Pos
itive Path
(Cr
anki
ng)
VDC
+-
DVOM
Battery
+-
Step 5
Te
st #5
Vo
ltage Drop Across Negative Path
(Cranking)
Step 6
VDC
+-
DVOM
Batt
ery
+-
Inspect For Corrosion at Terminal Connections:
Use a wire brush to clean the surfaces of the connections.
Inspect All Crimped Connections:
Tighten loose crimps or replace the connectors.
Check and/or Replace Solenoid:
Test 2 – Test 3 = Voltage Drop in Electrical Path
VDC
VDC
-
=
VDC
St
ep 4
+ 3.00
VDC
0.00
VDC
1.00
VDC
2.00
VDC
Acceptable Questionable Not Acceptable
Inspect All Cabling For Damage:
Replace all damaged cabling.
Inspect Wiring Cables for Correct Sizing:
Use American Wire Gauge (AWG) or Society of Automotive
Engineers (SAE) specifications for guidance.
(Test 2
)
(Test 3)
(V
o
l
tage Drop in electrical path)
Sta
rter
-
+
Starter
-
+
Starter
-
+
Note: Use
starter end
pl
ate a
s
test point.
Note: Use
starter e
nd
plate as
test point.
Note: Tou
ch
meter lead to
actual battery
termin
al.
Starter Testing Procedures