Operator's Manual
9
ASSEMBLY
Overhead Chute Rotation Control w/ 2-Way
Pitch or 4-Way Pitch & Rotation Control
2 Way/4 Way
Control
Chute Control Rod
Chute
Assembly
Figure 12
NOTE: If equipped with a metal chute
assembly - This assembly will install the
same the standard chute shown in the
figures of this procedure.
1. Remove hairpin clip (a), wing nut (b) and hex screw (c) from
chute control head and clevis pin (d) and bow-tie cotter pin
(e) from chute support bracket (Figure 13).
Chute Control Head
Chute
Assembly
Chute Support
Bracket
Chute Base
d
a
c
b
e
1
2
Figure 13
NOTE: For smoothest operation, cables should all be to the left of
the chute control rod.
2. Insert chute control rod into chute control head. Push rod as
far into chute control head as possible, keeping holes in rod
pointing upward (Figure 14).
Figure 14
3. Place chute assembly onto chute base and ensure chute control
rod is positioned above lower handle. Install hex screw (c)
removed in Step 1, but do not secure with wing nut at this time
(Figure 15).
c
Figure 15
4. Squeeze trigger on 2-way/4-way chute control and rotate
chute by hand to face forward. The holes in chute control
collar will be facing up (Figure 16).
Chute Control Collar
Top View
2-Way/4-Way Chute
Control (One O’clock
Position)
Figure 16
IMPORTANT: Chute will not rotate without squeezing trigger
on 2-way/4-way chute control.
5. Rotate 2-way/4-way chute control to one o’clock position
(Figure 16) so that indicator arrow on pinion gear below
control handle faces upward (Figure 17).