Full Product Manual
20 Section 3 — controlS & operation
Electric Chute Directional 
Control Joystick (If Equipped)
The electric chute directional control joystick 
is located on the right side of the dash panel. 
Refer to Figure 3-10.
•  To change the direction in which snow 
is thrown, move the joystick to the right 
or to the left.
•  To change the angle/distance which 
snow is thrown, pivot the joystick 
forward or backward.
DIRECTIONAL CONTROL
ELECTRIC CHUTE 
CHUTE
ROTATE
LEFT
CHUTE
ROTATE
RIGHT
CHUTE TILT UP
CHUTE TILT DOWN
Figure 3-10
Manual Chute Directional 
Control (Units with Electric 
Chute Directional Control 
Joystick) (If Equipped)
Follow this procedure to manually change the 
chute direction on units equipped with an 
electric chute directional control joystick and 
manual chute directional control rod only. See 
Figure 3-1.
1.  Remove cotter pin (a) from either of the 
holes furthest from the chute assembly on 
chute rotation assembly. See Figure 3-11.
(a)
Figure 3-11
2.  Push in chute control rod until the hole 
in it lines up with the third hole in chute 
rotation assembly. See Figure 3-11.
3.  Reinsert cotter pin (a) through this hole 
and chute control rod as shown in 
Figure 3-11.
4.  Grasp indented portion of chute control 
rod and manually rotate chute assembly 
to the right or to the left. See Figure 
3-12.
Figure 3-12
Overhead Chute Directional 
Control (w/ Flex Shaft) (If 
Equipped)
The overhead chute directional control is 
located at the rear of the unit towards the 
left side under the handle panel. To change 
direction in which snow is thrown, rotate chute 
directional control. See Figure 3-13.
CHUTE DIRECTIONAL CONTROL
DISCHARGE
LEFT
DISCHARGE
RIGHT
Figure 3-13
E-Z Chute™ (If Equipped)
Rotate the chute assembly to the left or right 
using the chute handle (a). See Figure 3-14.
(a)
Figure 3-14
Chute-Pitch Control (If Equipped)
The two-way chute-pitch control is located on 
the left side of the dash panel and is used to 
control the distance of snow discharge from 
the chute.
To change the upper chute angle to control the 
distance that snow is thrown, pivot the lever 
forward or backward. See Figure 3-15.
Two-Way Chute-Pitch Control
•  To Reduce the Distance Snow is 
Thrown:  Move the lever forward to 
pivot the upper chute down. See Figure 
3-15.
•  To Increase the Distance Snow is 
Thrown: Move the lever rearward to 
pivot the upper chute upward. See 
Figure 3-15.
Two-Way Indexed Chute-Pitch Control
•  To Reduce the Distance Snow is 
Thrown:  Disengage lever from the 
current chute-pitch setting. Move the 
lever forward to pivot the upper chute 
down to the desired pitch setting (a). 
See Figure 3-15.
•  To Increase the Distance Snow is 
Thrown: Disengage lever from the 
current chute-pitch setting. Move the 
lever rearward to pivot the upper chute 
upward to the desired pitch setting (a). 
See Figure 3-15.
TWO-WAY CHUTE-PITCH CONTROL
CHUTE TILT
DOWN
CHUTE TILT
UP
TWO-WAY INDEXED CHUTE-PITCH CONTROL
CHUTE TILT
DOWN
CHUTE TILT
UP
(a)
Figure 3-15










