Replacement Part List
Assembly & Installation
4
9
Install mounting bracket assembly on tractor
as follows:
1. Remove hitch bracket.
2. For ZT1 installation only: Place two
washers (736-0242) between hitch
bracket adapter (789-02298) and the
hitch bracket removed in Step 1.
3. Install bracket assembly to the tractor’s
lower frame with two capscrews (710-
0376). See Figure 4-3.
Figure 4-3
4. Hang adapter bracket assembly onto
upper frame tube and connect to hitch
bracket adapter (789-02298) with two
screws (710-0376), two cup washers
(736-0242) ,and two flange lock nuts
(710-04063). See Figure 4-4.
Note: Make sure that the adapter bracket
is seated firmly on the upper tube frame.
Figure 4-4
5. Tighten all of the hardware installed at
this time.
NOTE: References to left, right, front and rear
of the tractor are from the operator’s position,
unless otherwise stated.
• Before assembly, place the tractor on a
firm, level surface, disengage the PTO,
stop the tractor engine, and set the
parking brake.
Assemble Mounting Brackets
1. Install 12 rubber pads (735-05938) into
adapter bracket (789-02277) using the
mounting holes shown in Figure 4-1.
Figure 4-1
NOTE: Check the bumper pads after
each season for excessive wear and
replace as necessary.
Install Bracket Assembly on Tractor
NOTE: When assembling this mounting
assembly, it is best to not fully tighten the
bracket at this time. This will facilitate the
mounting process in later steps, which will
then require fully tightening this mounting
assembly.
Note: The Triple Bagger 19A70056100 may
only be attached to Ultima ZT2 series RZT’s.
Use Figure 4-2 to determine model by type
of hitch bracket. Please contact customer
service if you have any discrepancies.
ZT1
ZT2
Figure 4-2
Install Vertical Support
Note: This manual covers various
bagger configurations. Please follow the
instructions applicable to your machine.
1. Using Figure 4-5 and the chart below,
locate the correct mounting hole location
on the mounting bracket for your tractor:
Model No. Description Position
19A70054100 42/46” Double Bagger 4
19A70055100 50/54” Double Bagger 3
19A70056100 50/54” Triple Bagger 1
Figure 4-5
Note: Hole position 2 is currently not
used.
2. Install the vertical support bracket onto
the mounting assembly on the tractor by
hooking it over the mounting assembly as
shown in Figure 4-6.
3. Secure the upright support bracket to
the mounting assembly using a hex bolt
(710-0376) and flange lock nut (712-
04063) from hardware pack 689-01419.
See Figure 4-6.
Figure 4-6