Phau Ntawv Qhia
Wiring Centre10
System Setup
Zone Type Toggle Switches
DIP Switches
1. Demand RF Test
2. Enable Creepage
3. Heat Enable Delay 1 minute.
4. Heat Enable Delay 2 minutes.
In normal use these DIP switches can be ignored and should be
Heat Enable Delay, Dip Switches 1 & 2
Switch 2 ON, Switch 1 OFF = Will delay the heat output for 1 minute.
Switch 2 OFF, Switch 1 ON = Will delay the heat output for 2 minutes.
Switch 2 ON, Switch 1 ON = Will delay the heat output for 3 minutes.
1
ENABLE CREEPAGE
HEAT ENABLE 1
DELAY (MINS) 2
ON DIP
2 3 4
AUX
ZONE 1
1 2 3
There is a 3 position toggle switch above each zone. This switch allows
To enable creepage protection, put switch 3 to the ON position
Creepage Protection, Dip Switch 3
Position 1 - Zone output only.
When a thermostat is in demand, the UH8-RF
will activate the Zone output to actuators only,
PUMP and HEAT outputs will remain off.
Position 2 - Zone output with heat demand.
When a thermostat is in demand the UH8-RF
will activate the zone output to the actuators
and heat demand to the boiler.
Position 3 - Zone output with heat demand
and manifold pump.
When a thermostat is in demand, the UH8-RF
will activate the zone output to the actuators,
the heat demand to the boiler and the manifold
pump.
ZONE 1
1 2 3
ZONE 1
1 2 3
There is a 4 way dip switch responsible for 3 functions;
left in the off position.
3 different switched outputs when the thermostat demands heat.
On the RF-Switch, press and hold the CH1 pairing button for
5 seconds.
The CH1 status LED will start to flash.
Press and release the pairing button on the UH8-RF.............
When the RF-Switch detects the pairing signal from the UH8-RF,
the CH1 LED will stop flashing.
Pairing the UH8-RF V2 to the RF-Switch
•
•