Technical data

6
CTC EcoZenith i250
General Information
Check list
The check list must be completed by the installer.
In the event of a service, this information may be called for.
Installation must always be done according to the installation and maintenance instructions.
Installation must always be carried out in a professional manner.
Following installation, the unit must be inspected, functional checks performed and the customer
informed.
The points below should be checked off.
Pipe installation
CTC EcoZenith i250 filled, positioned and adjusted in the correct manner according to the
instructions.
CTC EcoZenith i250 positioned so that it can be serviced.
The radiator pump’s capacity for the required flow.
Open radiator valves and other relevant valves.
Tightness test.
Bleeding and pressurising the system.
Safety valve function test.
The waste pipe is connected to the draining gutter.
Electrical installation
Power switch
Correct tight wiring
Requisite sensors for applicable system
Outdoor sensor
Room sensors (optional)
Accessories
Information for the customer (adapted to current installation)
Start-up with customer/installer.
Menus/controls for selected system
Installation and maintenance manual supplied to the customer
Checks and filling, heating system
Trimming information, heat curve
Alarm information
Mixing valve
Safety valve function test
Guarantee and insurance
Information on procedures for fault registration
______________________________________ ______________________________________
Date / Customer Date / Installer