Technical data
50
CTC EcoZenith i250
Installation
Installation
11. Installation
This chapter is aimed at anyone responsible for one or more of the
installations required to ensure that the product works the way the property
owner wants.
Take your time going through functions and settings with the property owner
and answer any questions. Both you and the CTC EcoZenith i250 benefit
from a user who has completely understood how the system operates and
should be maintained.
11.1 Transportation
Transport the unit to the installation site before removing the packaging.
Handle the product in the following manner:
• Forklift
• Lifting eye that has been fitted to the lifting sleeve on top of the
EcoZenith i250. An extra sleeve can be found in the middle, under the
insulation.
• Lifting band around the pallet. NB: Can only be used with the
packaging on.
Remember that the CTC EcoZenith i250 has a high centre of gravity and
should be handled with caution.
11.2 Unpacking
Unpack the CTC EcoZenith i250 when it is placed next to its installation
site. Check that the product has not been damaged in transit. Report any
transport damage to the carrier. Also check that the delivery is complete
according to the list below.
Standard delivery
• CTC EcoZenith i250 system tank with factory-installed charge pump for
connection of heat pump.
• Kit bag containing:
- room sensor
- primary flow sensor
- return sensor
- outdoor sensor
- installation and maintenance manual
- safety valve for drinking water, 9 bar
- safety valve for cold side, 3 bar
- 2 x cable ties
- 3 x current sensors
!
The product must
be transported and
stored in an upright
position.