Technical data
42
CTC EcoZenith i250
General Information
Factory settings coded
This menu is intended to set the manufacturer’s
operational and alarm limits. A 4-digit code must be
specified to be able to amend these limits. However,
you can also take a look without any code to see what
options feature in the menu.
!
NB: Only an authorised service engineer is allowed to log in to the Factory settings
coded option. Severe operational problems and faults may occur affecting the
product if values are amended without authorisation. Note that in such cases the
warranty terms do not apply.
Quick start compressor
(Applies only if heat pump is installed.)
When starting up the product, the compressor’s start
is delayed by 10 minutes. This function speeds up this
process.
Software update, USB
This is only for service engineers. This option can be
used to update the software in the display via USB. The
software update process is complete when the start
menu appears.
Write log to USB
This is only for service engineers. This function can be
used to save logged values to a USB memory stick.
Control current sensors
This is for identifying which current sensor is connected
to the relevant phase.
All three currents (L1, L2 and L3) will appear in the
current operational data when EcoZenith i250 has
identified the current transformers’ relevant phases.
When activating the function “Control current
sensors” it is important that you have switched off
any major consumers of electricity in the house.
Also make sure that the backup thermostat in CTC
EcoZenith i250 is turned off.
Re-installation
This command re-launches the installation sequence.
See the chapter on First start.
!
NB: The power to the product
must not be interrupted, under any
circumstances, during the update
process.
1 2
1 2
T ºC
60
40
20
0
-20
16 20 0 4 8 12
Room temp.
Heating circuit 1
Night reduction Holiday
Room temp.
Heating circuit 1 (50)
Night reduction Holiday
Heat pump
Compressor Permitted
Min outdoor temp °C -15
Brine pump on 10 days 0
Tariff HP Off
Minimum run time 6
Electric heater
Boiler upper°C 50
Boiler upper add°C 57
Boiler upper extra DHW°C 60
Boiler upper max kW 5.5
Boiler lower °C 55
Boiler lower max kW 6.0
Delay mixing valve 180
Main fuse A 25
Input voltage 3x400 V
Upper tank
Stop temp HP°C Max
Start/stop diff upper ºC 7
Max time upper tank 20
Max time lower tank 40
Communication
MB address 1
Baud rate 9600
Parity even
Stop bit 1
Save settings
Save settings?
Def Heat pump
Heat pump Off
Flow/level switch None
Test Heating circuit
Mixing valve1 Open
Rad pump1 On
Mixing valve2 Off
Rad pump2 Off
LED room sensor On
Test valves
Test Elec.heater
3-way valve Down
Electric heater L1A Off
Electric heater L1B Off
Electric heater L2A Off
Electric heater L2B Off
Electric heater L3A Off
Electric heater L3B Off
Electric heater A13 Off
Alarm log
Latest alarm: Time HP (b) LP (b) SH (K) I(A)
Low brine flow 07:20 6/3 8.8 3.3 15.9 3.9
Stored alarms:
Wrong phase order 10:30 1/3 27.9 8.6 -227 50.0
Comm. error motor protect 09:01 1/3 27.9 3.6 42.2
0.0
Factory settings coded
Code 0 0 0 0
Upper tank
Lower tank
Compressor operation
Expansion valve
Log compressor stop
Operation data heating 2
Out Room1 Prim1 Return Room2 Prim2
Test Heat pump
HP Compr. Off
HP Brine p/Fan Off
HP Charge p 0
Defrost Manually Off
Compressor heat Off
Drip tray heater Off
Heating Cable Off
4-way valve(Y11) Off
Svenska Nederlands English Deutsch
Suomi Française Dansk Norsk
1 2
1 2
22,2 ºC 21,2 ºC 58 ºC -5 ºC
1 2
1 2
1 2
06 - 09 18 - 21
07 - 09 20 - 23
06 - 09 10 - 21
06 - -- -- - 21
06 - -- -- - 21
10 - 12 20 - 23
10 - 12 20 - 23
1 2
1 2
T ºC
60
40
20
0
-20
16 20 0 4 8 12
06-09 18-21
07-09 00-00
06-09 00-00
06-09 00-00
06-09 00-00
10-12 00-00
10-12 00-00
Room temp. DHW Operation Installer
CTC EcoZenith Monday 09:35
Night reduction Holiday
Heating circuit 2 (50)
Heating circuit 1
Room temp.
Start menu
Room temperature settings
Selecting DHW comfort
Heating system data
Installer settings menu
Extra
Hot water
0.0 hours
On
Temperature
Normal
Weekly schedule
DHW
Weekly program Day by day
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Weekly program DHW
Operation data system
Status HP upper tank
Tank upper°C 49 (60)
Tank lower°C 42 (45)
Primary flow°C 42 (43)
Return flow°C 34
Radiator pump On
Mixing valve Open
Delay mixing valve 180
Electric power kW 0.0 0.0 0.0
Current L1/L2/L3 0.0 0.0 0.0
Operation data EcoZenith
Stored oper data
Heating circuit 2
Operation data heating
Installer
Time/Language Settings Define system Service
Software display PCB: 20120205
Software HP PCB: 20120125
Installer
Installer
Time 21:34
Date 2012-02-05
Settings
Heating circuit
Heating circuit 1
Heating circuit 2
Heat pump
Electric heater
Upper tank
Remote control NR
Communication
Save settings
Load settings
Load factory settings
Max primary flow°C 55
Min primary flow°C Off
Heating off, out°C 18
Heating off 120
Inclination°C 50
Adjustment°C 0
Room temp reduced°C -2
or
Primary flow reduced°C -3
Define system
Def heating circuit
Heating circuit 1
Heating circuit 2
Heat pump
SMS
Cooling
Heating circuit 1 Yes
Room sensor 1 Yes
Type Wire
Service
Function test
Function test
Alarm log
Factory settings coded
Quick start compressor.
Software update, USB
Write log to USB
Control current sensors
Re-installation
Heating circuit
Heat pump
Valves
Electric heater
Total operation time h: 14196
Max primary flow°C: 51
Consumtion kWh 20
Compressor:
Operation time /24 h:m 00:00
Stored oper data
Heat pump
Compressor On
Charge pump On 47%
Brine pump On
HP in/out°C 35.5 / 42.3
Current L1 4.0
Night reduction heat circ.
Weekly program Day by day NR
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Night reduction heat circ.
Weekly program Block NR
Decrease Sunday 22:00
Increase Friday 14:00
Decrease -------- 00:00
Increase -------- 00:00
Holiday
Holiday period 3 days
Out Room1 Prim1 Return Room2 Prim2
!
NB: Turn off the power and always
restart the product after the
program update! Several minutes
may pass before the display
communicates clearly after restart.