Technical data
30
CTC EcoZenith i250 
General Information
8.5.2 Stored operation data
This menu shows the operational values for the 
EcoZenith i250 over a long period. 
Total Operating Time h
Shows the total time during which the product has been 
on.
Maximum Primary Flow °C
Shows the highest temperature supplied to the 
radiators. The value may indicate the radiator system’s/
house’s temperature requirements. The lower the value 
during the winter period, the more suitable it is for heat 
pump operation.
Mixing valve
Shows whether the mixing valve increases (opens) or 
reduces (closes) the heat supplied to the radiators. 
When the correct temperature has been achieved 
with the mixing valve, the valve’s motor then remains 
stationary.
Delay mixing valve
A microswitch in the mixing valve’s motor ensures that 
auxiliary heating is not used unnecessarily, for example, 
when ventilating a room or if the temperature (outdoors) 
occasionally drops during the night. The mixing valve 
is delayed for the time period selected before auxiliary 
heating is used. The screen shows the countdown of 
the delay in minutes. If “Blocked” is shown, never open 
the mixing valve to the immersion heaters of the upper 
tank.
Electric power kW
Shows the boiler’s additional power (0 to 9.0 kW + 0 to 
6.0 kW).
Current L1/L2/L3
Shows the system’s total current consumption at the 
various phases L1/L2/L3, provided that three current 
sensors have been fitted to the unit’s incoming cables. If 
the current sensors mounting devices are not identified, 
only the phase with the highest load is displayed. 
If the current exceeds the main fuse size, the boiler 
automatically switches down a power step to protect 
the fuses, for example, when several high-consumption 
appliances are being used in the house.
 Svenska  Nederlands  English  Deutsch
 Suomi  Française  Dansk  Norsk
1 2
1 2
  22,2 ºC  21,2 ºC  58 ºC  -5 ºC
1 2
1 2
1 2
  06 - 09  18 - 21
  07 - 09  20 - 23
  06 - 09  10 - 21
 06 - --  -- - 21
 06 - --  -- - 21
  10 - 12  20 - 23
  10 - 12  20 - 23
1 2
1 2
T ºC
60
40
20
0
-20
16  20  0  4  8 12
06-09 18-21
07-09 00-00
06-09 00-00
06-09 00-00
06-09 00-00
10-12 00-00
10-12 00-00
  Room temp.  DHW  Operation  Installer
CTC EcoZenith  Monday 09:35
Night reduction Holiday
Heating circuit 2 (50)
Heating circuit 1
Room temp.
Start menu
Room temperature settings
Selecting DHW comfort
Heating system data
Installer settings menu
Extra
Hot water 
0.0 hours
On
Temperature
Normal
Weekly schedule
DHW
Weekly program  Day by day
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Weekly program DHW
Operation data system
Status  HP upper tank
Tank upper°C  49 (60)
Tank lower°C  42 (45)
Primary flow°C  42 (43)
Return flow°C  34
Radiator pump  On
Mixing valve  Open
Delay mixing valve  180
Electric power kW  0.0 0.0 0.0
Current L1/L2/L3  0.0 0.0 0.0
Operation data EcoZenith
Stored oper data
Heating circuit 2
Operation data heating
Installer
Time/Language  Settings  Define system  Service
Software display PCB:  20120205
Software HP PCB:  20120125
Installer
Installer
Time 21:34
Date 2012-02-05
Settings
Heating circuit
Heating circuit 1
Heating circuit 2
Heat pump
Electric heater
Upper tank
Remote control  NR
Communication
Save settings
Load settings
Load factory settings
Max primary flow°C  55
Min primary flow°C  Off
Heating off, out°C  18
Heating off  120
Inclination°C 50
Adjustment°C 0
Room temp reduced°C  -2
 or
Primary flow reduced°C  -3
Define system
Def heating circuit
Heating circuit 1
Heating circuit 2
Heat pump
SMS
Cooling
Heating circuit 1  Yes
Room sensor 1  Yes
Type Wire
Service
Function test
Function test
Alarm log
Factory settings coded
Quick start compressor.
Software update, USB
Write log to USB
Control current sensors
Re-installation
Heating circuit 
Heat pump
Valves
Electric heater
Total operation time h:  14196
Max primary flow°C:    51
Consumtion kWh    20
Compressor:
 Operation time /24 h:m  00:00
Stored oper data
Heat pump
Compressor On
Charge pump  On 47%
Brine pump  On
HP in/out°C  35.5 / 42.3
Current L1  4.0
Night reduction heat circ.
Weekly program  Day by day  NR
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Night reduction heat circ.
Weekly program  Block  NR
Decrease  Sunday 22:00
Increase  Friday 14:00
Decrease  -------- 00:00
Increase  -------- 00:00
Holiday
Holiday period  3 days
Out  Room1 Prim1  Return Room2  Prim2
 Svenska  Nederlands  English  Deutsch
 Suomi  Française  Dansk  Norsk
1 2
1 2
  22,2 ºC  21,2 ºC  58 ºC  -5 ºC
1 2
1 2
1 2
  06 - 09  18 - 21
  07 - 09  20 - 23
  06 - 09  10 - 21
 06 - --  -- - 21
 06 - --  -- - 21
  10 - 12  20 - 23
  10 - 12  20 - 23
1 2
1 2
T ºC
60
40
20
0
-20
16  20  0  4  8 12
06-09 18-21
07-09 00-00
06-09 00-00
06-09 00-00
06-09 00-00
10-12 00-00
10-12 00-00
  Room temp.  DHW  Operation  Installer
CTC EcoZenith  Monday 09:35
Night reduction Holiday
Heating circuit 2 (50)
Heating circuit 1
Room temp.
Start menu
Room temperature settings
Selecting DHW comfort
Heating system data
Installer settings menu
Extra
Hot water 
0.0 hours
On
Temperature
Normal
Weekly schedule
DHW
Weekly program  Day by day
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Weekly program DHW
Operation data system
Status  HP upper tank
Tank upper°C  49 (60)
Tank lower°C  42 (45)
Primary flow°C  42 (43)
Return flow°C  34
Radiator pump  On
Mixing valve  Open
Delay mixing valve  180
Electric power kW  0.0 0.0 0.0
Current L1/L2/L3  0.0 0.0 0.0
Operation data EcoZenith
Stored oper data
Heating circuit 2
Operation data heating
Installer
Time/Language  Settings  Define system  Service
Software display PCB:  20120205
Software HP PCB:  20120125
Installer
Installer
Time 21:34
Date 2012-02-05
Settings
Heating circuit
Heating circuit 1
Heating circuit 2
Heat pump
Electric heater
Upper tank
Remote control  NR
Communication
Save settings
Load settings
Load factory settings
Max primary flow°C  55
Min primary flow°C  Off
Heating off, out°C  18
Heating off  120
Inclination°C 50
Adjustment°C 0
Room temp reduced°C  -2
 or
Primary flow reduced°C  -3
Define system
Def heating circuit
Heating circuit 1
Heating circuit 2
Heat pump
SMS
Cooling
Heating circuit 1  Yes
Room sensor 1  Yes
Type Wire
Service
Function test
Function test
Alarm log
Factory settings coded
Quick start compressor.
Software update, USB
Write log to USB
Control current sensors
Re-installation
Heating circuit 
Heat pump
Valves
Electric heater
Total operation time h:  14196
Max primary flow°C:    51
Consumtion kWh    20
Compressor:
 Operation time /24 h:m  00:00
Stored oper data
Heat pump
Compressor On
Charge pump  On 47%
Brine pump  On
HP in/out°C  35.5 / 42.3
Current L1  4.0
Night reduction heat circ.
Weekly program  Day by day  NR
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Night reduction heat circ.
Weekly program  Block  NR
Decrease  Sunday 22:00
Increase  Friday 14:00
Decrease  -------- 00:00
Increase  -------- 00:00
Holiday
Holiday period  3 days
Out  Room1 Prim1  Return Room2  Prim2