Technical data

7
CTC EcoZenith i250
General Information
Important to remember!
Check the following in particular on delivery and installation:
The product must be transported and stored in an upright position.
When moving the product, it can be placed temporarily on its back.
Remove the packaging and check before installation that the product
has not been damaged in transit. Report any transport damage to the
carrier.
Place the product on a solid foundation, preferably made of concrete.
If the product is to stand on a soft carpet, plates must be placed
under the feet.
Remember to leave a service area of at least 1 m in front of the
product.
The product must not be placed below floor level either.
Safety Instructions
The following safety instructions must be observed when handling, installing
and using the product:
Close the safety switch before doing any work on the product.
The product must not be flushed with water.
When handling the product with a hoist ring or similar device, make
sure that the lifting equipment, eyebolts etc. are not damaged. Never
stand under the hoisted product.
Never jeopardise safety by removing bolted covers, hoods or similar.
Never jeopardise safety by deactivating safety equipment.
Any work done on the product’s electrical system should be done by a
qualified professional.
Safety valve check:
- The safety valve for the boiler/system and domestic hot water (DHW)
must be checked on a regular basis. See the chapter on Operation and
maintenance.
!
If these instructions
are not followed when
installing, operating
and maintaining the
system, Enertech’s
commitment under the
applicable warranty
terms is not binding
Information for the property owner to note
Complete the fields below. This information is useful if any servicing work is required
Product : Manufacturing number:
Product : Manufacturing number:
Installation company Tel. no.
Date Name
Electrical installation company Tel. no.
Date Name
No liability is accepted for any misprints or changes.