Checklist
The check list must be completed by the installer.
•  In the event of a service, this information may be called for. 
•  Installation must always be done according to the installation and maintenance instructions. 
•  Installation must always be carried out in a professional manner. 
•  Following installation, the unit must be inspected, functional checks performed and the customer 
informed. 
The points below should be checked off.
Pipe installation
  CTC EcoZenith i250 filled, positioned and adjusted in the correct manner according to the 
instructions.
  CTC EcoZenith i250 positioned so that it can be serviced.
  Capacity of circulation pump(s) for required flow.
  Open radiator valves and other relevant valves.
  Tightness test.
  Bleeding and pressurising the system.
  Safety valve function test.
  The waste pipe is connected to the draining gutter.
Electrical installation
  Power switch
  Correct tight wiring
  Primary flow sensor, return sensor + any required sensors for chosen system
  Outdoor sensor
  Room sensor (optional)
  Accessories
  Heat pump activated and started
Information for the customer (adapted to current installation)
  Start-up with customer/installer.
  Menus/controls for selected system
  Installation and maintenance manual supplied to the customer
  Check and filling, heating system
  Trimming information, heat curve
  Alarm information
  Mixing valve
  Safety valve function test
  Information on procedures for fault registration 
______________________________________   ______________________________________