Technical data

16
CTC EcoZenith i250
General Information
6. Control system
The CTC EcoZenith i250 has an advanced yet
straightforward control system with a touchscreen on
which all settings are entered directly.
The CTC EcoZenith i250 control system:
monitors all functions in the system tank, heat
pump and heating system.
Permits individual settings
Displays desired values, such as temperatures,
operation times, energy consumption and fault
signals.
Facilitates the setting of values and troubleshooting
in a simple and well-structured way.
Factory values
The CTC EcoZenith i250 is delivered with set factory
values which are suitable for a standard house with
a standard radiator system. The CTC EcoZenith i250
automatically adjusts the water temperature to the
primary flow’s current heating requirement. This is
monitored by the control system, which continuously
ensures that you are provided with optimum function
and economy. These values are easy to change as and
when required. Ask your installer to help you determine
the correct values.
Heat pump
On delivery the CTC EcoZenith i250 is ready for
connection to a CTC heat pump – either the CTC EcoAir
400 outdoor air heat pump, the CTCEcoAir 520M or
the CTC EcoPart400 bedrock/ground source heat
pump.
NB: Note that the connection of the CTC EcoAir520M
inverter is dealt with in a separate section!
This means that the control system already contains all
the controls for the heat pump. When the heat pump
has been defined (On) the CTC EcoZenithi250 senses
which heat pump has been connected
Installer/Define/Heat pump
Once this has taken place the menus for the heat pump
are displayed. On delivery the compressor is blocked
and must be set to permitted. This is done under the
Installer/Settings/Heat pump menu.
Menu structure
The product’s menus are described on the following
pages. First there is an overview and then each menu is
described in detail.
Svenska Nederlands English Deutsch
Suomi Française Dansk Norsk
1 2
1 2
22,2 ºC 21,2 ºC 58 ºC -5 ºC
1 2
1 2
T ºC
60
40
20
0
-20
16 20 0 4 8 12
00 - 06 22 - 24
00 - 06 22 - 24
00 - 06 22 - 24
00 - 06 22 - 24
00 - 06 23 - 24
00 - 08 23 - 24
00 - 08 22 - 24
06 - 09 18 - 21
07 - 09 -- - --
08 - 09 -- - --
08 - -- -- - 21
08 - -- -- - 21
10 - 12 20 - 23
10 - 12 20 - 23
Room temp. DHW Operation Installer
CTC EcoZenith Monday 09:35
Night reduction Holiday
Heating circuit 2 (50)
Heating circuit 1
Room temp.
Start menu
Room temperature settings
Selecting DHW comfort
Heating system data
Installer settings menu
Extra
Hot water
0.0 hours
On
Temperature
Normal
Weekly schedule
DHW
Operation data system
Status HP upper tank
Tank upper°C 49 (58)
Tank lower°C 42 (45)
Electric power kW 0.0+2.5
Current L1/L2/L3 0.0 0.0 0.0
Diff func. Pump / ºC On 32
Pool ºC Off 22(20)
Operation data EcoZenith
Stored oper data
Heating circuit
Operation data heating
Installer
Time/Language Settings Define system Service
Software display PCB: 20120205
Software HP PCB: 01234
Installer
Installer
Time 21:34
Date 2012-02-05
Settings
Heating circuit 1
Heating circuit 1
Heating circuit 2
Heat pump
Electric heater
Upper tank
Remote control None
Communication
Solar panels
Diff thermostat function
Pool
Save settings
Load settings
Load factory settings
Max primary flow°C 55
Min primary flow°C Off
Heating off, out°C 18
Heating off 120
Inclination°C 50
Adjustment°C 0
Room temp reduced°C -2
or
Primary flow reduced°C -3
>>
Define system
Def heating circuit 1
Heating circuit 1
Heating circuit 2
Heat pump
CTC SMS
Cooling
Solar panels
Diff thermostat function No
Pool (G50, G51, B50) No
Heating circuit 1 Yes
Room sensor 1 Yes
Type Wire
Service
Function test
Function test
Alarm log
Factory settings coded
Quick start compressor.
Software update, USB
Write log to USB
Control current sensors
Re-installation
Heating circuit
Heat pump
Valves
Electric heater
Solar
Diff thermostat function
Pool
Total operation time h: 14196
Max primary flow°C: 51
Consumtion kWh 20
Compressor:
Total Operation time 1540
Stored oper data
Heat pump
Compressor On
Charge pump On 47%
Brine pump On
HP in/out°C 35.5 / 42.3
Current L1 4.0
Night reduction heat circ.
Weekly program Block NR
Decrease Sunday 22:00
Increase Friday 14:00
Decrease -------- 00:00
Increase -------- 00:00
Holiday
Holiday period 3 days
Out Room1 Prim1 Return Room2 Prim2
Settings language
Night reduction heat circ. 1
Weekly program Day by day NR
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Weekly program Day by day DHW
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Weekly program DHW
1 2
Dansk Nederlands Čeština
Svenska Norsk English
Eesti Polski Slovenščina
Deutsch Suomi Française
Operation data system
Define Cooling
Cooling No
Common heating/cooling No
Condense pipe secured No
Room temp. cooling 25.0
Def heating circuit 1
Heating circuit 1 Yes
Room sensor 1 Yes
Type Wire
Def heating circuit 1
Heating circuit 1 Yes
Room sensor 1 Yes
Type Wireless
Action
Disconnect
Status
Associated
Level of signal
Battery 85%
Version x0102
Def CTC SMS
Activate Yes
Level of signal
Phone Number 1 +46712345678
Phone Number 2 -----------------
Hardware Version 1 1
Software Version 1 9
Pump H-tank (G46) Off
Temperatures
H-tank (B6) ºC 32
Test Diff thermostat function
Charge start diff temp ºC
7
Charge stop diff temp ºC
3
Charge temperature °C 60
Sett. Diff termostat function
Holiday
Cooling 20.2 (20.0)
Heating circuit 1 20.2 (20.0)
Room temp.
Night reduction
Op. Heating Circuit
Primary flow1 ºC 33(34)
Return flow ºC 31
Radiator pump Till
Mixing valve Open
Delay mixing valve 180
Primary flow 2ºC 33(34)
Radiator pump 2 Från
Mixing valve 2
Settings language
Settings language
The screen shows operating information with the
CTC EcoAir heat pump connected.
The screen shows operating information with the
CTC EcoPart heat pump connected.
Start menu
Svenska Nederlands English Deutsch
Suomi Française Dansk Norsk
1 2
1 2
22,2 ºC 21,2 ºC 58 ºC -5 ºC
1 2
1 2
1 2
1 2
1 2
T ºC
60
40
20
0
-20
16 20 0 4 8 12
00 - 06 22 - 24
00 - 06 22 - 24
00 - 06 22 - 24
00 - 06 22 - 24
00 - 06 23 - 24
00 - 08 23 - 24
00 - 08 22 - 24
06 - 09 18 - 21
07 - 09 -- - --
08 - 09 -- - --
08 - -- -- - 21
08 - -- -- - 21
10 - 12 20 - 23
10 - 12 20 - 23
Room temp. DHW Operation Installer
CTC EcoZenith Monday 09:35
Night reduction Holiday
Heating circuit 2 (50)
Heating circuit 1
Room temp.
Start menu
Room temperature settings
Selecting DHW comfort
Heating system data
Installer settings menu
Extra
Hot water
0.0 hours
On
Temperature
Normal
Weekly schedule
DHW
Operation data system
Status HP upper tank
Tank upper°C 49 (58)
Tank lower°C 42 (45)
Electric power kW 0.0+2.5
Current L1/L2/L3 0.0 0.0 0.0
Diff func. Pump / ºC On 32
Pool ºC Off 22(20)
Operation data EcoZenith
Stored oper data
Heating circuit
Operation data heating
Installer
Time/Language Settings Define system Service
Software display PCB: 20120205
Software HP PCB: 01234
Installer
Installer
Time 21:34
Date 2012-02-05
Settings
Heating circuit 1
Heating circuit 1
Heating circuit 2
Heat pump
Electric heater
Upper tank
Remote control None
Communication
Solar panels
Diff thermostat function
Pool
Save settings
Load settings
Load factory settings
Max primary flow°C 55
Min primary flow°C Off
Heating off, out°C 18
Heating off 120
Inclination°C 50
Adjustment°C 0
Room temp reduced°C -2
or
Primary flow reduced°C -3
>>
Define system
Def heating circuit 1
Heating circuit 1
Heating circuit 2
Heat pump
CTC SMS
Cooling
Solar panels
Diff thermostat function No
Pool (G50, G51, B50) No
Heating circuit 1 Yes
Room sensor 1 Yes
Type Wire
Service
Function test
Function test
Alarm log
Factory settings coded
Quick start compressor.
Software update, USB
Write log to USB
Control current sensors
Re-installation
Heating circuit
Heat pump
Valves
Electric heater
Solar
Diff thermostat function
Pool
Total operation time h: 14196
Max primary flow°C: 51
Consumtion kWh 20
Compressor:
Total Operation time 1540
Stored oper data
Heat pump
Compressor On
Charge pump On 47%
Brine pump On
HP in/out°C 35.5 / 42.3
Current L1 4.0
Night reduction heat circ.
Weekly program Block NR
Decrease Sunday 22:00
Increase Friday 14:00
Decrease -------- 00:00
Increase -------- 00:00
Holiday
Holiday period 3 days
Out Room1 Prim1 Return Room2 Prim2
Settings language
Night reduction heat circ. 1
Weekly program Day by day NR
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Weekly program Day by day DHW
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Weekly program DHW