Specifications

Filename: CSI STS-7030-New1.docx 9/4/13 Page 3 of 3 Pages
9. Motor: UL Listed, TEFC, Thermal overload protection, continuous duty
C. Performance / Design Criteria: System shall be capable of filtering the entire tank volume with a
required filtration run-time of ideally 24 hours, but no more than 48 hours. Sufficient sediment as well as
water-holding capacity should be ensured. System run-time requirements will vary with climate, tank-
layout, fuel delivery, refueling intervals, etc. and shall be adjusted in accordance with the input from
pressure and vacuum gauges as well as water sensor.
D. Operation: System shall provide dry contacts for summary alarm and leak detection alarm to interface
with building monitoring or building alarm system. An external shut down feature shall be provided to
interrupt pump operation from a remote location such as a BMS. Additionally, the System may be
remotely controlled by deactivating the PLC Controller timer.
DISCLAIMER STATEMENT
This guide specification is intended for use by a qualified construction Specifier. It is meant to be used in
conjunction with the procedures of each design firm, and the particular requirements of a specific
construction project.