Owner Manual

IMPORTANTINSTRUCTIONS
Installation Notes:
1. Bar as Selected
2. Flange Cover Plate
3. Flange
4. Stud
5. Drywall
6. Tile (if applicable)
7. 1/4” (6mm) Diameter Pilot Hole TILE PROJECTS ONLY
8. 1/8” (3mm) Diameter Pilot Hole into Stud
9. 10/24” x 2” Threaded Stainless Steel Hanger Bolt
10. Threaded Stainless Steel Bolt Nut
11. 2” Self-tapping screw
Installation Steps:
1. Locate wall stud or previously installed backer board.
2. Use the flange as a template to mark the mounting hole locations. (We recommend using a
level to achieve perfect horizontal or vertical mounting.)
3. Drill 1/8” (3mm) diameter pilot hole into stud for each flange.
a. If wall is tiled, drill through the tile with a 1/4” (6mm) diameter masonry drill bit.
4. Drive hanger bolts for center post directly into stud using hanger bolt driver leaving 1/4” of
thread exposed. (NOTE: Hanger bolts for center post MUST be installed before the end
posts are fastened to the wall.)
5. Place Flange over exposed hanger bolts.
6. Screw bolt nut onto hanger bolts until secure.
7. Using the 2” self-tapping screws, fasten each end post to the wall.
8. After all flanges are secured, apply bead of clear sealant around bottom rim of flange cover
SAFETYNOTE:Conceal edInWallsupportbackingisALWAYSREQUIREDforthisproduct(notincluded)
andmustbesuppliedandselectedbyalicensedinstaller/contractortomeetbothweightbearingand
local code requirements. PRODUCT INSTALLATION SHOULD BE DONE BY A LICENSED
INSTALLER/CONTRACTOR.
CAUTION:Personalinjuryand/orpropertydamagemayresult
fromimproperwallsupportormounting,
whichisnotcoveredunderwarranty.
WARNING:DoNOTusethisinstructionsheetforgrabbarswithweldedstudorinternalthreads.
ITISESSENTIALTOMARKTHECENTERLINEDISTANCEBETWEENTHETWOMOUNTINGFLANGEPLATES
ONEACHSIDEAS WELLASTHEDISTANCE FROM
CENTER OFEACHMOUNTINGPLATETOTHEFINISH
FLOORTOASSUREPROPERALIGNMENT.