Installation Guide
Table Of Contents
IMPORTANT INSTRUCTIONS
SAFETY NOTE: Concealed In-Wall support backing is ALWAYS REQUIRED for this product (not included) – and
must be supplied and selected by a licensed installer/contractor to meet both weight bearing and local code
requirements. 
PRODUCT INSTALLATION SHOULD BE DONE BY A LICENSED INSTALLER/CONTRACTOR. 
CAUTION: Personal injury and/or property damage may result from improper wall support or mounting, which
is not covered under warranty. 
Installation Notes:
1. Bar as Selected
2. Flange Cover Plate
3. Flange
4. Stud
5. Drywall
6. Tile (if applicable)
7. 1/4” (6mm) Diameter Hole – TILE
ONLY
8. 1/8” (3mm) Diameter Pilot Hole into Stud
9. 10/24” x 2” Threaded Stainless Steel Hanger Bolt
10. Threaded Stainless Steel Bolt Nut
Installation Steps:
1. Read ALL safet y warni ngs before installing the gr ab bar.
2. Locate wall stud or previously installed backer board.
3. Use the flange plates to mark the mounting hole locations. (We recommend using a level to achieve perfect horizontal or
vertical mounting.)
4. Drill 1/ 8” (3mm) diameter pilot hole into stud.
a. If wall is tiled, drill through the tile with a 1/4” (6mm) diameter masonry drill bit .
5. Drive hanger bolt directly into stud using hanger bolt drive r leaving 1/4” of thread exposed.
6. Place Flange over exposed hanger bolt.
7. Screw bolt nut onto hanger bolt.
8. After flange is secured, apply bead of clear sealant around bottom rim of flange cover plate and carefully align the cover
plate locking tabs with the slots in the flange.


